Coral

Under Construction
Last 2 unitsQ4 2028
Aldoar, Foz do Douro e Nevogilde, Porto
More Info About The Project

Summary

Price / m²

€4,617 – €5,376

Ticket

€2.0M – €2.0M

Area

372 – 444 m²

Availability

0 / 2

Sold out

Zone benchmark

Units

2 units · 2 available (100%) · €4,6175,376/m²

4BR· Floor 3 · 444 m²Last 2
Available
€2,050,000€4,617/m²
4BR· Floor 2 · 372 m²Last 2
Available
€2,000,000€5,376/m²

Payment schedule

Position transfer · No
From 2,000,000Delivery Q4 2028
  1. Step 110%
    200,000

    Reservation & CPCV

    Est. On CPCV signing

  2. Step 220%
    400,000

    Construction milestones

    Est. Oct 2027

  3. Step 370%
    1,400,000

    Keys & deed

    Est. Dec 2028

Simulators

Choose a calculator — each one is pre-loaded with this project's pricing.

Location & neighbourhood

Coral

Aldoar, Foz do Douro e Nevogilde, Porto

Neighbourhood

Aldoar, Foz do Douro e Nevogilde

Ask about the area

Developer's description, as published

Introducing Coral, an exclusive residential project located in the elegant Foz do Douro area of Porto. This small-scale building was designed to provide a private and tranquil living experience, featuring only three apartments that prioritize space, comfort, and privacy. The location stands out for its proximity to some of Foz's most emblematic spots, such as the Praia da Senhora da Luz area and the banks of the Douro River, allowing for daily enjoyment of the connection between city, river, and ocean. Within minutes, you'll also find traditional shops, essential services, and renowned schools, creating a practical and balanced environment for everyday life. With contemporary architecture and meticulous attention to materials and finishes, Coral was conceived to offer bright and functional spaces where aesthetics and comfort naturally complement each other. Situated in one of Porto's most valued residential areas, this project represents a rare opportunity for those seeking quality of life, tranquility, and proximity to the sea, within a sophisticated and established urban environment. Construction is underway, with completion scheduled for Q4 2028.