Edifício Collegium

Under Construction
Selling fastImminent deliveryQ3 2026
Canidelo, Vila Nova de Gaia
More Info About The Project

Summary

Price / m²

€2,397 – €3,513

Ticket

€262k – €555k

Area

76 – 192 m²

Availability

0 / 6

Sold out

Zone benchmark

Units

6 units · 6 available (100%) · €2,3973,513/m²

1BR· Floor 3 · 76 m²
Available
€267,000€3,513/m²
1BR· Floor 1 · 117 m²
Available
€290,000€2,479/m²
1BR· Floor 2 · 76 m²
Available
€262,000€3,447/m²
2BR· Floor 1 · 156 m²Last 2
Available
€374,000€2,397/m²
2BR· Floor G · 113 m²Last 2
Available
€372,000€3,292/m²
3BR· Floor 1 · 192 m²Last
Available
€555,000€2,891/m²

Payment schedule

Position transfer · No
From 262,000Delivery Q3 2026
  1. Step 110%
    26,200

    Reservation & CPCV

    Est. On CPCV signing

  2. Step 220%
    52,400

    Construction milestones

    Est. Aug 2026

  3. Step 370%
    183,400

    Keys & deed

    Est. Sept 2026

Simulators

Choose a calculator — each one is pre-loaded with this project's pricing.

Location & neighbourhood

Edifício Collegium

Canidelo, Vila Nova de Gaia

Neighbourhood

Canidelo

Ask about the area

Developer's description, as published

Edifício Collegium is a new residential development in Canidelo, one of the most sought-after residential areas of Vila Nova de Gaia, set on a quiet street just 900 metres from Salgueiros Beach. The building offers 1BR, 1BR+1, 2BR and 3BR apartments, each with a balcony or terrace, private parking and storage, and generous interior areas ranging from roughly 76 to 192 m². Finishes are high specification throughout, including equipped kitchens, quartz worktops, thermal-break aluminium frames with double glazing, electric blinds and air conditioning with a heat pump for hot water. The location combines coastal living with easy access to schools, shops, supermarkets and public transport, and quick road connections to Gaia and central Porto. Prices range from €262,000 to €555,000. Delivery is scheduled for Q3 2026. Developed by HB – Grupo Habinédita. Payment is structured as 10% on the promissory contract (CPCV), two further 10% instalments during construction, and the remaining 70% on deed.