Miramar Tower

completed
Last 3 units2023
Aldoar, Foz do Douro e Nevogilde, Porto
Savills logo

Summary

Price / m²

€5,370 – €6,357

Ticket

€2.3M – €3.3M

Area

409 – 613 m²

Availability

0 / 3

Sold out

Project Infos

Commercial

Savills logo

Zone benchmark

Units

3 units · 3 available (100%) · €5,3706,357/m²

4BR· Floor 7 · 419 m²
Available
€2,250,000€5,370/m²
4BR· Floor 13 · 409 m²
Available
€2,600,000€6,357/m²
4BR· Floor 14 · 613 m²
Available
€3,300,000€5,383/m²

Payment schedule

Position transfer · No
From 2,250,000Delivery 2023
  1. Step 110%
    225,000

    Reservation & CPCV

    Est. On CPCV signing

  2. Step 220%
    450,000

    Construction milestones

    Est. Apr 2025

  3. Step 370%
    1,575,000

    Keys & deed

    Est. Dec 2023

Simulators

Choose a calculator — each one is pre-loaded with this project's pricing.

Location & neighbourhood

Miramar Tower

Aldoar, Foz do Douro e Nevogilde, Porto

Neighbourhood

Aldoar, Foz do Douro e Nevogilde

Ask about the area

Developer's description, as published

The Miramar Tower is a project by the OODA studio — a building of modern, bold architecture, designed with a great deal of transparency that privileges the outdoor spaces and the superb views over Foz and the Douro River. A minimalist tower where the view extends to the maximum, it offers the perfect balance between contemporary urban rhythm and a family-friendly lifestyle. It was designed for a community that appreciates a different point of view — between the animation of the beaches and the promenade and the privacy offered by its vast balconies and terraces. Located in one of the most sought-after areas of the city, the Miramar Tower overlooks the river and the sea from a privileged position. The extraordinary view impresses as far as the eye can see, while its proximity to cultural points of interest and to the most reputable national and international schools and universities makes it an object of desire. The development comprises 3 exclusive 4BR residences, with generous gross private areas ranging from 409 to 613 m², complemented by ample balconies, parking and storage. The building is crowned by a communal terrace with panoramic views. The project is complete, delivered in 2023.